Production planning and cost estimating for a traditional concrete pour in India: A practical work study analysis Amarjit Singh, Siddharth Shankar, Kumar Neeraj Jha View Abstract
A study on the flow performance of SCC against multiple resistance from the reinforcement T. D.Guneswara Rao, Rama Seshu. D, Anubhav Kashyap Das View Abstract
Thermal performance evaluation of bottom ash blended concrete roof in tropical climatic zone Asifur Rahman, Jayanta Mondol, Subhasis Neogi, Shamim Haidar View Abstract
Assessing early-stage corrosion in prestressed concrete exposed to chlorides using electrochemical impedance spectroscopy Dyana Joseline, Radhakrishna G. Pillai View Abstract
The modular ratio of reinforced concrete N. Subramanian View Abstract
Cover
A34 Perry Barr Interchange at Birchfield Island in UK, prestressed concrete single span integral abutment bridge designed by WSP. The girders as well as abutments were precast and Modern Method of Construction (MMC) was followed.