cancelbutton
  • Home
  • /
  • Archive
  • /
  • 2015
  • /
  • October

October - 2015

    Technical Papers
  • Construction of desilting chamber for the Kol dam hydroelectric power project Nilesh N. Bamane
  • Launching of PSC I girder for the most critical span over central railway track portion in Mihan flyover cum interchange project Ravikant Shukla
  • Business innovation on ROWA – a modern high-performance machine for tunneling at Rohtang highway tunnel project A.K. Mishra
  • A case study of settlement and ground improvement techniques implemented in LNG marine at Kochi Gopalakrishnan R.
  • Jetty work by innovative technique N. Ganesan, Ruby Abraham, Deepa Raj S. and Divya Sasi
  • Use of free flow concrete for arch infill at Chenab bridge project Surajit Choudhury
  • Innovation on testing of steel fibre reinforced shotcrete at Rohtang highway tunnel project A.K. Mishra
  • Metakaoline an alternate to microsilica in high strength concrete Santosh G. Narvekar
  • High strength concrete without use of cementitious additive Surajit Choudhury
  • Influence of geotechnical engineering for operational excellence in infrastructure projects Raja Rajan. K
  • Features
  • Guest Editorial
  • Letters to the Editor
  • News and Events
  • Discussion Forum – Preliminary seismic evaluation aid for reinforced concrete framed structures based on IS 15988 (2013) guidelines
Supported by
Helpline 18001033444 Subscribe to Newsletter