Oct 2015

OCTOBER 2015

SPECIAL ISSUE 

CASE STUDIES

Construction of desilting chamber for the Kol dam hydroelectric power project
Nilesh N. Bamane

Launching of PSC I girder for the most critical span over central railway track portion in Mihan flyover cum interchange project
Ravikant Shukla

Business innovation on ROWA – a modern high-performance machine for tunneling at Rohtang highway tunnel project
A.K. Mishra

A case study of settlement and ground improvement techniques implemented in LNG marine at Kochi
Gopalakrishnan R.

Jetty work by innovative technique
Biswajit Malo

Use of free flow concrete for arch infill at Chenab bridge project
Surajit Choudhury

Innovation on testing of steel fibre reinforced shotcrete at Rohtang highway tunnel project
A.K. Mishra

Metakaoline an alternate to microsilica in high strength concrete
Santosh G. Narvekar

High strength concrete without use of cementitious additive
Surajit Choudhury

Influence of geotechnical engineering for operational excellence in infrastructure projects
Raja Rajan. K

 



EDITORIAL
.

GUEST EDITORIAL

.

LETTERS TO THE EDITOR

.

NEWS & EVENTS

.

DISCUSSION FORUM – Preliminary seismic evaluation aid for reinforced concrete framed structures based on IS 15988 (2013) guidelines






     
sherri hill sale cheap la femme dresses sherri hill sale sherri hill sale sherri hill sale prom dresses 2016 prom dresses 2016 sherri hill sale sherri hill sale blush dresses sale blush dresses sale sherri hill sale